By continuing to use the website or clicking Accept you consent to our cookies and personal data policy and confirm that you are at least 18 year old. For details please see Privacy Policy and Terms
In this grow I'll challenge a GPT that's a specialized horticulturist. Each of us gets a clone of the same strain and we foster them with our own care plans. I will provide daily image updates to the model so it can improve on it's plan on the way. I will add water and nutrients, top/prune as the model says. At the end we will compare the yield - which will decide who wins the challenge.
We will do the same with two Gelato #45 clones.
I also happen to have a slightly older Tropicanna Banana which we will foster together. This should do for a good first study.
-----------------------------
Here are the first instructions for Blueberry#2 the AI wants me to follow:
Blueberry #2
Current Condition
Smaller, indicating a need for more focused care.
Detailed Care Plan
Weeks 1-4 (Vegetative Stage):
LST:
Start: Begin LST around the 3rd week. Carefully bend the main stem and tie it down.
Tying Down: Spread out the side branches as they grow.
Pruning:
Lower Branches: Remove lower growth that is shaded.
Topping: Top the plant after 4-6 sets of leaves to encourage more colas.
Nutrients:
Mix: Use NPK 5-2-5 at 2 ml per liter of water.
Frequency: Every 3 days.
Weeks 5-6 (Transition Stage):
LST: Continue training to maintain an even canopy.
Pruning: Remove large fan leaves blocking light.
Nutrients:
Mix: Combine NPK 5-2-5 and NPK 2-5-8 in a 1:1 ratio.
Dosage: 2 ml per liter of water.
Frequency: Every 3 days.
Weeks 7-12+ (Flowering Stage):
LST: Adjust ties for even light distribution.
Pruning: Defoliate larger leaves.
Nutrients:
Mix: Use NPK 2-5-8 at 2 ml per liter of water.
Frequency: Every 3 days.
-----------------------------
And these are the specific instructions for the first week:
Day | Task | Details
-----------------------------
1 | Watering | Water with NPK 5-2-5 nutrient mix (2 ml/L). Ensure soil is moist but not waterlogged.
2 | Monitoring | Check soil moisture. Adjust watering if necessary.
3 | LST Preparation | Identify the main stem and gently start bending it. Secure with soft string or pipe cleaner.
4 | Watering | Water with plain water if soil is dry.
5 | Pruning | Remove any lower leaves that are touching the soil.
6 | Monitoring | Check for signs of stress or pests. Adjust LST ties if needed.
7 | Watering | Water with NPK 5-2-5 nutrient mix (2 ml/L).
-----------------------------